The situation you are in
The survey lives in Excel, the take-off in someone's head, the load calc in another file. One missed item and the main breaker is sized wrong — discovered on site.
What you hold at handover
No silent errors: anything the software skips is listed with its reason.
Scope
- Automatic survey and take-off from the DWG drawing
- Load calculation, demand factor, breaker and cable sizing
- Outlet counting and draft panel schedule
- Every skipped item reported with the reason it was skipped
- Excel and PDF output, convertible to quote format
- On-premise deployment and engineer training