1. Sensimar Spa & Resort Hotel
Completed: 2008
Yüklenici: Botam Yapı Grubu.


Engineering References
Electrical design, installation and contracting work we have completed since 2006. Hotels, hospitals, solar power plants, industrial facilities and residential projects.
49 projects · 58 photos
Our reference file (2006–2024)
Full list of completed work and site photos — 41-page PDF (Turkish). · 18.7 MB
Work completed by our founder, Electrical Engineer Osman Bodur — from the Side Solar Enerji reference file. Project names and descriptions are shown in their original Turkish.
Completed: 2008
Yüklenici: Botam Yapı Grubu.


Completed: 2011
İşveren: İş GYO · Nevşehir.

Completed: 2011
50.000 m². İşveren: Murat-A Tur. A.Ş. · Side / Antalya.

Completed: 2012
İşveren: Doğan Otelcilik Ltd. Şti. · Side / Antalya.

Completed: 2012
40.000 m². İşveren: Turab A.Ş. – Barut Hotels · Side / Antalya.

Completed: 2012
45.000 m². İşveren: Oyunsu Tur. Ltd. Şti. · Okurcalar / Alanya.

Completed: 2012
İşveren: Botam Yapı Grubu · Sorgun / Manavgat.

Completed: 2013
İşveren: Yavuz Babalar A.Ş. · Evrenseki / Manavgat.

Completed: 2013
25.000 m². İşveren: Kırımoğlu Ltd. Şti. · Evrenseki / Manavgat.

Completed: 2013
70.000 m².

Completed: 2013
400 oda, 25.000 m² inşaat uygulaması. İşveren: TCS – TransComsStroy · Krasnaya Polyana / Soçi.


Completed: 2014
17.000 m². İşveren: K Hotelcilik Tur. Ltd. Şti.

Completed: 2015
35.000 m². İşveren: Tümbüller Ltd. Şti. · Manavgat / Antalya.



Completed: 2015
35.000 m². İşveren: Berberler Ltd. Şti. · Manavgat / Antalya.


Completed: 2015
80.000 m². İşveren: Turaçlar A.Ş. · Özdere / İzmir.



Completed: 2016
25.000 m². İşveren: Karadeniz Örme A.Ş. · Side / Manavgat.

Completed: 2016
25.000 m². İşveren: 3M Side Ltd. Şti. · Çolaklı / Manavgat.

Completed: 2016
İşveren: 3M Side Ltd. Şti. · Çolaklı / Manavgat.

Completed: 2023



Completed: 2024



Completed: 2015
A.G + 800 kVA trafo.


Completed: 2017
620 yataklı, 200.000 m².





Completed: 2017






Completed: 2019
Elektrik yapım işi.




Completed: 2018
Yapım işi.

Completed: 2020
Proje ve yapım işi.



Completed: 2018
A.G ve 1000 kVA trafo.